Sparrows End Roadworks moved to 1/2 Term – John Lodge

I wanted to provide an update to residents about the major utility works that will shortly close the B1052 at Sparrows End Hill for 9 days. Frankly I have been as appalled as many residents are about the lack of coordination and forethought by the County Council and utility company on this issue, particularly since it is a lifeline route for the town. Since I found out about it I have been lobbying ECC hard on residents’ behalf. I am happy to say that they have now instructed the utility contractor to shift the works back 10 days later so that it coincides with school 1/2 term. This will help minimise the disruption. I am now pushing them to do a better job on an HGV route and signage.

Cllr John Lodge
Saffron Walden Division County Councillor

4 thoughts on “Sparrows End Roadworks moved to 1/2 Term – John Lodge

  1. DAVE

    HI JOHN. I’M A LORRY DRIVER AND I COME DOWN TO SAFFRON EVERY OTHER NIGHT. THE B1O52 IS THE OFFICIAL ROUTE INTO SAFFRON. WHAT OTHER ROUTE CAN I TAKE THAT IS SAFE FOR A ARTICULATED LORRY TO USE. THE DATES I SAW FOR THE CLOSURE WHERE FROM THE 18TH TO THE 26TH MAY. ARE THESE THE NEW DATES OR OLD ONES. MANY THANKS DAVE.

    Reply
    • DAVE

      I’M COMING IN FROM JUN 10 OFF THE M11 AND MY HEIGHT IS 14FT 3INS. WILL THEY LET US USE OTHER ROAD THAT HAS THE WEIGHT LIMIT SIGN ON. THANKS DAVE.

      Reply